|
Construction Progress Photos
(Updated 7/2/2008)
4/23/2008 - Drainage on Stonebreak Road 4/26/2008 - Clearing on Main Access 5/7/2008 - Drainage Installation on Stonebreak Road 5/15/2008 - Stormwater Treatment Basin Grading 5/15/2008 - Stonebreak Road (looking west) 5/15/2008 - Western Connector (Looking North) 5/15/2008 - Main Access (Looking West) 5/21/2008 - Stonebreak Road looking west from Western Connector 5/21/2008 - Main Acccess Road looking east 5/21/2008 - Main Access Road looking east 5/23/2008 - Looking West on Stonebreak Road 5/23/2008 - Looking East on Stonebreak Road 5/23/2008 - Looking West on Stonebreak Road 5/23/2008 - Looking east on Stonebreak Road 5/23/2008 - Excavation on Stonebreak Road 5/30/2008 - Installing steel casing for future utilities 07-01-2008 - Stonebreak Road looking west 07/01/2008 - Stonebreak Road - looking east 07/01/2008 - Stonebreak Road with the Racemark Driveway in the distance 07/01/2008 - Stonebreak Road, looking west from the Racemark Driveway 07/01/2008 - Excavation for the mitigation area on Main Access Road. 07/01/2008 - Main Access Road 07/01/2008 - Main Access with Rt 67 in the horizon 07/01/2008 - Main Access Road 07/01/2008 - Clearing for Main Access Road, looking from the intersection with Western Connector looking East 07/01/2008 - Clearing for Main Access Road, taken from the intersection with Eastern Connector looking west 07/01/2008 - Clearing for Main Access Road, taken from the intersection with Eastern Connector looking East
07/01/2008 - Eastern Connector road looking north from Main Access.
4/23/2008 - Drainage on Stonebreak Road
© 2008 Creighton Manning Engineering, LLP 17 Computer Drive West · Albany, NY 12205 · 518-446-0396 Please send any
comments/questions regarding this site to
LFTC@cmellp.com
All images used on this website are copyrighted by Creighton Manning Engineering. Any reproduction or unauthorized usage is forbidden except with the expressed written consent of Creighton Manning Engineering,
LLP. |