4/23/2008 - Drainage on Stonebreak Road 4/26/2008 - Clearing on Main Access 5/7/2008 - Drainage Installation on Stonebreak Road 5/15/2008 - Stormwater Treatment Basin Grading 5/15/2008 - Stonebreak Road (looking west) 5/15/2008 - Western Connector (Looking North) 5/15/2008 - Main Access (Looking West) 5/21/2008 - Stonebreak Road looking west from Western Connector 5/21/2008 - Main Acccess Road looking east 5/21/2008 - Main Access Road looking east 5/23/2008 - Looking West on Stonebreak Road 5/23/2008 - Looking East on Stonebreak Road 5/23/2008 - Looking West on Stonebreak Road 5/23/2008 - Looking east on Stonebreak Road 5/23/2008 - Excavation on Stonebreak Road 5/30/2008 - Installing steel casing for future utilities 07-01-2008 - Stonebreak Road looking west 07/01/2008 - Stonebreak Road - looking east 07/01/2008 - Stonebreak Road with the Racemark Driveway in the distance 07/01/2008 - Stonebreak Road, looking west from the Racemark Driveway 07/01/2008 - Excavation for the mitigation area on Main Access Road. 07/01/2008 - Main Access Road 07/01/2008 - Main Access with Rt 67 in the horizon 07/01/2008 - Main Access Road 07/01/2008 - Clearing for Main Access Road, looking from the intersection with Western Connector looking East 07/01/2008 - Clearing for Main Access Road, taken from the intersection with Eastern Connector looking west 07/01/2008 - Clearing for Main Access Road, taken from the intersection with Eastern Connector looking East
07/01/2008 - Eastern Connector road looking north from Main Access. 7/10/2008 - Excavation on Stone Break Road 7/10/2008 - Looking west at the Intersection of Main Access and Western Connector. 7/29/2008 - Pile Driving Operations 8/1/2008 - Looking east from the intersection of Western Connector and Main Access. 8/1/2008 - Grading on Stone Break Road (looking east) 9/15/2008 - Transmission Duct installation 9/15/2008 - Transmission Duct installation 9/15/2008 - Transmission Duct 9/15/2008 - Pre-cast concrete culverts 9/15/2008 - Precast concrete culvert instllation 9/15/2008 - Pre-cast concrete culvert installation 11/21/2008 - Looking East on Stonebreak Road from the Hermes Road roundabout 11/23/2008 - Roundabout at Stonebreak Road and Hermes Road 11/21/2008 - Looking west on Stonebreak Road 11/23/2008 - Completed box culvert on Stonebreak Road 5/7/2009 - Iron Waterline waiting ready for installation 5/7/2009 - The roundabout on Stonebreak Road at its intersection with Hermes Road 5/7/2009 - Stonebreak Road looking towards Route 9 5/7/2009 - Landscaping along Stonebreak Road 5/7/2009 - Lowering the precast bridge units into place on Main Access 5/7/2009 - Main Access bridge structure 5/29/09 - Geofoam installation 6/11/09 - Placement of Geofoam blocks on top of the the bridge structures 6/11/09 - Compacting soil around the geofoam blocks. 7/8/09 - Traffic Monitoring equipment 7/8/09 - Stonebreak Road looking east 7/8/09 - Stonebreak Road looking east 7/8/09 - Lighting at the Stonebreak Road and Hermes Road roundabout 7/8/09 - Multi-Use path along Main Access Road 7/8/09 - Landscaped median along Main Access 7/8/09 - Landscaped Median and Multi-use path along Main Access 7/8/09 - Wetland Mitigation Areas 7/16/09 - Streetprint installation in the roundabout islands 7/16/09 - Completed street print 7/28/09 - Stonebreak Road 7/28/09 - Stonebreak Road looking east from the Hermes Road roundabout 7/28/09 - Lighting along Stonebreak Road 7/28/09 - Stonebreak Road and Hermes Road Roundabout 7/28/09 - Looking west from the Main Access and Eastern Connector roundabout 8/14/09 - Pouring a concrete slab above the foam fill 8/14/09 - Slab over the Main Access structures 8/14/09 - Completed slab on Main Access 8/31/09 - Top Course paving and striping completed on Stone Break Road. 8/31/09 - Top course paving and pavement markings on Stone Break Road 8/31/09 - Subgrade grading on Main Access 8/31/09 - Slope protection on Main Access 10/12/09 - Stream channel realignment throguh the Main Access culvert 10/12/2009 - Decorative finish on the concrete culvert beneath the Main Access road 10/21/09 - Completed stormwater treatment pond on Main Access 11/20/09 - The Cold Springs Connector and Main Access roundabout 12/1/09 - Looking west at Main Access Drive and Western Connector Intersection 12/1/09 - Final pavement lane markings, crosswalks and lighting at the Main Access and Western Connector intersection 12/1/09 - Completed decorative finish on the concrete culverts 12/1/09 - Final signing, lighting and crosswalks at the Stonebreak Road and Western Connector intersection 12/1/09 - Final pavement markings and guide rail at the Western Connector and Main Access Intersection
4/23/2008 - Drainage on Stonebreak Road
© 2009 Creighton Manning Engineering, LLP 17 Computer Drive West · Albany, NY 12205 · 518-446-0396 Please send any
comments/questions regarding this site to
LFTC@cmellp.com
All images used on this website are copyrighted by Creighton Manning Engineering. Any reproduction or unauthorized usage is forbidden except with the expressed written consent of Creighton Manning Engineering,
LLP. |