Hardscrabble Wind Power Project
Project Highlights
Project Description:The project involves the construction of a wind farm consisting of 37 Gamesa turbines on 100m towers that will have an output capacity of approximately 76 MW. The project is part of a continuing effort to supply more renewable energy to consumers while minimizing environmental impacts to every extent practicable. In addition to the turbines, the project will consist of an O & M facility, collection system, collection and interconnection substations and layout areas for project components and materials. Off-site improvements identified by the Transportation Route Evaluation Study consist of intersection improvements, utility relocations and drainage improvements. Firm Role:Creighton Manning Engineering, as prime civil engineering consultant on this Iberdrola Renewables project, was responsible for the preparation of all preliminary site plans and the Stormwater Pollution Prevention Plan (SWPPP). Creighton Manning also prepared the Transportation Route Evaluation Study submitted as part of the DEIS. Additional services provided by the firm included:
Client:Iberdrola Renewables330 Province Line Road Skillman, NJ 08558 Reference:Neil HabigSenior Developer Ph: (609) 466-1475
|
Project Name: |

