Church Street
Project Highlights
Project Description:This Locally Administered Federal Aid Project involves preliminary and final design to reconstruct approximately 1 mile of urban roadway that serves as a major transportation corridor into the City and Saratoga Hospital. Major improvements included new pavement, curb, sidewalks, installation of a new closed storm sewer system, water main replacement and period street lighting. Intersection alternatives included widening for additional turn lanes or reconstruction as a modern roundabout. Project completion was accelerated to be part of the American Recovery and Reinvestment Act (ARRA). Firm Role:Creighton Manning Engineering was responsible for all design survey and mapping, including preparation of right-of-way acquisition maps. Additional services provided by Creighton Manning include:
Client:City of Saratoga SpringsEngineers Office 474 Broadway Saratoga Springs, NY 12866 Reference:Office of City EngineerPh: (518) 587-3550 Ext 621
|
Project Name: |

