Frank Sottile Boulevard Extension
Project Highlights
Project Description:Traffic planning, detailed traffic simulation modeling and preliminary engineering design project for the extension of Frank Sottile Boulevard to reduce congestion in the US Route 9W corridor due to growth in the Town. The need for the extension was identified in a 1990 Land Use/Transportation Study and its 1997 update pending completion of certain land development projects. Firm Role:As the traffic engineering subconsultant, Creighton Manning evaluated ten alternatives for the extension of Frank Sottile Boulevard. The evaluation included analysis of numerous intersections as well as interchange ramps and weaves. Weekday PM and Saturday conditions were analyzed given the high level of retail development in the study area. Traffic forecasts were generated by updating the TModel network created by Creighton Manning for the 1997 Land Use/ Transportation Study update. Preliminary engineering design included the roadway extension and alternatives with various interchange configurations with Route 199. Air quality studies and noise analyses were completed for the alternatives and presented in SEQR documentation. Client:Shuster Associates3578 Atwood Road Stone Ridge, NY 12484 Reference:Dan ShusterPh: (845) 687-0758
|
Project Name: |

